None
Recent plan failures
| Failed In | Fixed In | Time Taken To Fix | ||
|---|---|---|---|---|
| #13 |
Scheduled with changes by 16 people
|
Currently failing | ||
| #3 |
Manual run by Akeem Wells
|
#6 |
Specs configuration updated
|
3 builds 1 week, 3 days, 4 hours, 17 minutes |
- Average time to fix a failure: 5 days, 6 hours, 20 minutes
- Average number of builds between fixes: 1.5 builds
- The longest time taken to fix a failure is 1 week, 3 days, 4 hours, 17 minutes, from failure starting in build #3.
- The greatest number of builds taken to fix a failure is 3, from failure starting in build #3.