None
Last 25 builds Last 7 days Last 30 days Last 90 days All builds

Recent plan failures

Failed In Fixed In Time Taken To Fix
#28 Specs configuration updated

#30 Specs configuration updated

2 builds

18 minutes

#21 Specs configuration updated

#22 Specs configuration updated

1 build

3 minutes

#18 Specs configuration updated

#19 Specs configuration updated

1 build

6 minutes

#12 Specs configuration updated

#14 Specs configuration updated

2 builds

34 minutes

  • Average time to fix a failure: 15 minutes
  • Average number of builds between fixes: 1.5 builds
  • The longest time taken to fix a failure is 34 minutes, from failure starting in build #12.
  • The greatest number of builds taken to fix a failure is 2, from failure starting in build #12.