None
Recent plan failures
Failed In | Fixed In | Time Taken To Fix | ||
---|---|---|---|---|
#23 |
Specs configuration updated
|
Currently failing | ||
#10 |
Specs configuration updated
|
#12 |
Specs configuration updated
|
2 builds 2 minutes |
#8 |
Specs configuration updated
|
#9 |
Specs configuration updated
|
1 build 16 minutes |
#5 |
Specs configuration updated
|
#7 |
Specs configuration updated
|
2 builds 12 minutes |
- Average time to fix a failure: 1 week, 1 hour, 22 minutes
- Average number of builds between fixes: 2.25 builds
- The longest time taken to fix a failure is 4 weeks, 4 hours, 58 minutes, from failure starting in build #23.
- The greatest number of builds taken to fix a failure is 4, from failure starting in build #23.