None

Recent plan failures

Failed In Fixed In Time Taken To Fix
#89 Specs configuration updated

#92 Specs configuration updated

3 builds

8 minutes

#83 Specs configuration updated

#84 Specs configuration updated

1 build

1 minute

#81 Specs configuration updated

#82 Specs configuration updated

1 build

33 minutes

#74 Specs configuration updated

#76 Specs configuration updated

2 builds

35 minutes

  • Average time to fix a failure: 19 minutes
  • Average number of builds between fixes: 1.75 builds
  • The longest time taken to fix a failure is 35 minutes, from failure starting in build #74.
  • The greatest number of builds taken to fix a failure is 3, from failure starting in build #89.