Recent plan failures
Failed In | Fixed In | Time Taken To Fix | ||
---|---|---|---|---|
#25 |
Specs configuration updated
|
Currently failing | ||
#12 |
Specs configuration updated
|
#14 |
Specs configuration updated
|
2 builds 2 minutes |
#10 |
Specs configuration updated
|
#11 |
Specs configuration updated
|
1 build 16 minutes |
#7 |
Specs configuration updated
|
#9 |
Specs configuration updated
|
2 builds 12 minutes |
- Average time to fix a failure: 3 days, 15 hours, 50 minutes
- Average number of builds between fixes: 1.5 builds
- The longest time taken to fix a failure is 2 weeks, 14 hours, 50 minutes, from failure starting in build #25.
- The greatest number of builds taken to fix a failure is 2, from failure starting in build #7.