None

Recent branch failures

Failed In Fixed In Time Taken To Fix
#1 First build for this plan

Currently failing
  • Average time to fix a failure: 13 weeks, 5 days, 47 minutes
  • Average number of builds between fixes: 0 builds
  • The longest time taken to fix a failure is 13 weeks, 5 days, 47 minutes, from failure starting in build #1.
  • The greatest number of builds taken to fix a failure is 0, from failure starting in build #1.