None
Recent plan failures
Failed In | Fixed In | Time Taken To Fix | ||
---|---|---|---|---|
#52 |
Specs configuration updated
|
Currently failing | ||
#50 |
Specs configuration updated
|
#51 |
Specs configuration updated
|
1 build 9 minutes |
#33 |
Specs configuration updated
|
#35 |
Specs configuration updated
|
2 builds 1 minute |
#31 |
Specs configuration updated
|
#32 |
Specs configuration updated
|
1 build 16 minutes |
#28 |
Specs configuration updated
|
#30 |
Specs configuration updated
|
2 builds 12 minutes |
- Average time to fix a failure: 15 hours, 42 minutes
- Average number of builds between fixes: 1.2 builds
- The longest time taken to fix a failure is 3 days, 5 hours, 54 minutes, from failure starting in build #52.
- The greatest number of builds taken to fix a failure is 2, from failure starting in build #28.