None

Recent plan failures

Failed In Fixed In Time Taken To Fix
#52 Specs configuration updated

Currently failing
#50 Specs configuration updated

#51 Specs configuration updated

1 build

9 minutes

#33 Specs configuration updated

#35 Specs configuration updated

2 builds

1 minute

#31 Specs configuration updated

#32 Specs configuration updated

1 build

16 minutes

#28 Specs configuration updated

#30 Specs configuration updated

2 builds

12 minutes

  • Average time to fix a failure: 15 hours, 42 minutes
  • Average number of builds between fixes: 1.2 builds
  • The longest time taken to fix a failure is 3 days, 5 hours, 54 minutes, from failure starting in build #52.
  • The greatest number of builds taken to fix a failure is 2, from failure starting in build #28.