None
Recent plan failures
| Failed In | Fixed In | Time Taken To Fix | ||
|---|---|---|---|---|
| #616 |
Scheduled
|
#618 |
Scheduled
|
2 builds 1 day, 23 hours, 59 minutes |
| #601 |
Scheduled
|
#602 |
Scheduled
|
1 build 23 hours, 59 minutes |
- Average time to fix a failure: 1 day, 11 hours, 59 minutes
- Average number of builds between fixes: 1.5 builds
- The longest time taken to fix a failure is 1 day, 23 hours, 59 minutes, from failure starting in build #616.
- The greatest number of builds taken to fix a failure is 2, from failure starting in build #616.