Build: #24 was successful
Job: Test VLASS 1.1 Stakeholder Tests MPI Many Linux 2.28 cvpost EL8 was successful
Test results
- 1 test in total
- 33 minutes taken in total.
The following 1 test have passed:
Status | Test | Duration |
---|---|---|
test_stk_vlass_pipeline_imaging
test_stk_vlass_pipeline_imaging
|
33 mins |
- Showing 1-1 of 1