Build: #200 was successful

Job: Test VLASS 1.1 Stakeholder Tests MPI Many Linux 2.28 cvpost EL8 was successful

Test results

  • 4 tests in total
  • 39 minutes taken in total.

The following 4 tests have passed:

All successful tests
Status Test Duration
Successful test_tclean_vlass_pipeline test_vlass_1p1_jointmosaic_pcorr1and2
14 mins
Successful test_tclean_vlass_pipeline test_vlass_1p1_row_pcorr0
8 mins
Successful test_tclean_vlass_pipeline test_vlass_1p1_row_pcorr1_oneint
8 mins
Successful test_tclean_vlass_pipeline test_vlass_1p1_row_pcorr1and2_twoint
8 mins
  • Showing 1-4 of 4