Build: #15 was successful

Job: Test VLASS 1.2 Stakeholder Tests cvpost EL8 was successful

Test results

  • 1 test in total
  • 863 minutes taken in total.

The following 1 test have passed:

All successful tests
Status Test Duration
Successful test_stk_vlass_pipeline_imaging_1v2 test_stk_vlass_pipeline_imaging_1v2 History
863 mins
  • Showing 1-1 of 1