Build: #199 was successful
Job: Test SD Stakeholder Ephemeris Many Linux 2.28 cvpost EL8 was successful
Test results
- 1 test in total
- 29 minutes taken in total.
The following 1 test have passed:
| Status | Test | Duration |
|---|---|---|
|
test_stk_almasd_ephemeris
test_stk_almaSD_Ephemeris_mousXda
|
29 mins |
- Showing 1-1 of 1