Build: #176 was successful

Job: Test ALMA SD Stakeholder Multi Target Imaging Many Linux 2.28 cvpost EL8 was successful

Test results

  • 1 test in total
  • 65 minutes taken in total.

The following 1 test have passed:

All successful tests
Status Test Duration
Successful test_stk_sd_MultiTargetImaging test_stk_sd_MultiTargetImaging
65 mins
  • Showing 1-1 of 1