None

Recent plan failures

Failed In Fixed In Time Taken To Fix
#4 Specs configuration updated

#5 Specs configuration updated

1 build

20 hours, 59 minutes

  • Average time to fix a failure: 20 hours, 59 minutes
  • Average number of builds between fixes: 1 builds
  • The longest time taken to fix a failure is 20 hours, 59 minutes, from failure starting in build #4.
  • The greatest number of builds taken to fix a failure is 1, from failure starting in build #4.