None

Recent plan failures

Failed In Fixed In Time Taken To Fix
#97 Specs configuration updated

#98 Specs configuration updated

1 build

5 minutes

#95 Specs configuration updated

#96 Specs configuration updated

1 build

1 minute

#91 Specs configuration updated

#92 Specs configuration updated

1 build

55 minutes

#87 Specs configuration updated

#90 Specs configuration updated

3 builds

1 day, 2 minutes

#82 Specs configuration updated

#84 Specs configuration updated

2 builds

48 seconds

#79 Specs configuration updated

#80 Specs configuration updated

1 build

22 minutes

#75 Specs configuration updated

#76 Specs configuration updated

1 build

12 minutes

  • Average time to fix a failure: 3 hours, 40 minutes
  • Average number of builds between fixes: 1.43 builds
  • The longest time taken to fix a failure is 1 day, 2 minutes, from failure starting in build #87.
  • The greatest number of builds taken to fix a failure is 3, from failure starting in build #87.