None
Recent plan failures
Failed In | Fixed In | Time Taken To Fix | ||
---|---|---|---|---|
#40 |
Specs configuration updated
|
#43 |
Specs configuration updated
|
3 builds 1 week, 3 hours, 50 minutes |
#37 |
Specs configuration updated
|
#38 |
Specs configuration updated
|
1 build 5 minutes |
- Average time to fix a failure: 3 days, 13 hours, 58 minutes
- Average number of builds between fixes: 2 builds
- The longest time taken to fix a failure is 1 week, 3 hours, 50 minutes, from failure starting in build #40.
- The greatest number of builds taken to fix a failure is 3, from failure starting in build #40.