None

Recent plan failures

Failed In Fixed In Time Taken To Fix
#4 Manual run by Ville Suoranta

#8 Specs configuration updated

4 builds

3 hours, 22 minutes

  • Average time to fix a failure: 3 hours, 22 minutes
  • Average number of builds between fixes: 4 builds
  • The longest time taken to fix a failure is 3 hours, 22 minutes, from failure starting in build #4.
  • The greatest number of builds taken to fix a failure is 4, from failure starting in build #4.