None

Recent plan failures

Failed In Fixed In Time Taken To Fix
#44 Specs configuration updated

Currently failing
#42 Specs configuration updated

#43 Specs configuration updated

1 build

6 days, 6 hours, 28 minutes

#29 Specs configuration updated

#31 Specs configuration updated

2 builds

1 minute

#24 Specs configuration updated

#25 Specs configuration updated

1 build

16 minutes

#21 Specs configuration updated

#23 Specs configuration updated

2 builds

12 minutes

  • Average time to fix a failure: 2 days, 15 hours, 7 minutes
  • Average number of builds between fixes: 1.2 builds
  • The longest time taken to fix a failure is 6 days, 20 hours, 39 minutes, from failure starting in build #44.
  • The greatest number of builds taken to fix a failure is 2, from failure starting in build #21.