None

Recent plan failures

Failed In Fixed In Time Taken To Fix
#30 Specs configuration updated

Currently failing
#28 Specs configuration updated

#29 Specs configuration updated

1 build

4 days, 21 hours, 26 minutes

#15 Specs configuration updated

#17 Specs configuration updated

2 builds

1 minute

#11 Specs configuration updated

#12 Specs configuration updated

1 build

16 minutes

#8 Specs configuration updated

#10 Specs configuration updated

2 builds

12 minutes

  • Average time to fix a failure: 2 days, 8 hours, 25 minutes
  • Average number of builds between fixes: 1.2 builds
  • The longest time taken to fix a failure is 6 days, 20 hours, 11 minutes, from failure starting in build #30.
  • The greatest number of builds taken to fix a failure is 2, from failure starting in build #8.