None
Recent plan failures
Failed In | Fixed In | Time Taken To Fix | ||
---|---|---|---|---|
#136 |
Specs configuration updated
|
Currently failing | ||
#119 |
Specs configuration updated
|
#122 |
Specs configuration updated
|
3 builds 8 minutes |
- Average time to fix a failure: 16 hours, 46 minutes
- Average number of builds between fixes: 1.5 builds
- The longest time taken to fix a failure is 1 day, 9 hours, 23 minutes, from failure starting in build #136.
- The greatest number of builds taken to fix a failure is 3, from failure starting in build #119.