Build: #6 was successful Changes by Bob Garwood

Stages & jobs

  1. Default Stage

  2. Test

Test results

  • 697 tests in total
  • 1 test was fixed
  • 5 tests were quarantined / skipped
  • 36 minutes taken in total.
Fixed tests 1
Status Test Failing since View job Duration
Successful test_tool_sdm_toms asdm_import9.test_actual_durations
Failing since build #5 (Changes by Bob Garwood) Test Tools Many Linux 2.28 16 secs
Skipped tests 5
Status Test Failing since View job
Skipped test_tool_sdm SdmFrommsTest.test10

Passing on the master branch.

Test Tools Many Linux 2.28
Skipped test_tool_sdm SdmFrommsTest.test12

Passing on the master branch.

Test Tools Many Linux 2.28
Skipped test_tool_sdm_toms asdm_import7.test7_lazy3

Passing on the master branch.

Test Tools Many Linux 2.28
Skipped test_tool_sdm_toms asdm_import7.test7_skiprows1

Passing on the master branch.

Test Tools Many Linux 2.28
Skipped test_tool_simulator sm_settrop_test.test_smsettrop

Passing on the master branch.

Test Tools Many Linux 2.28