None
Recent branch failures
| Failed In | Fixed In | Time Taken To Fix | ||
|---|---|---|---|---|
| #1 |
First build for this plan
|
Currently failing | ||
- Average time to fix a failure: 43 weeks, 4 hours, 13 minutes
- Average number of builds between fixes: 3 builds
- The longest time taken to fix a failure is 43 weeks, 4 hours, 13 minutes, from failure starting in build #1.
- The greatest number of builds taken to fix a failure is 3, from failure starting in build #1.