None
Recent plan failures
Failed In | Fixed In | Time Taken To Fix | ||
---|---|---|---|---|
#65 |
Specs configuration updated
|
Currently failing | ||
#50 |
Specs configuration updated
|
#52 |
Specs configuration updated
|
2 builds 2 minutes |
- Average time to fix a failure: 1 week, 7 hours, 55 minutes
- Average number of builds between fixes: 1.5 builds
- The longest time taken to fix a failure is 2 weeks, 15 hours, 48 minutes, from failure starting in build #65.
- The greatest number of builds taken to fix a failure is 2, from failure starting in build #50.