None
Last 25 builds Last 7 days Last 30 days Last 90 days All builds

Recent plan failures

Failed In Fixed In Time Taken To Fix
#75 Specs configuration updated

#77 Specs configuration updated

2 builds

17 minutes

#66 Specs configuration updated

#67 Specs configuration updated

1 build

2 minutes

#60 Specs configuration updated

#61 Specs configuration updated

1 build

5 minutes

#54 Specs configuration updated

#56 Specs configuration updated

2 builds

33 minutes

  • Average time to fix a failure: 14 minutes
  • Average number of builds between fixes: 1.5 builds
  • The longest time taken to fix a failure is 33 minutes, from failure starting in build #54.
  • The greatest number of builds taken to fix a failure is 2, from failure starting in build #54.