a comprehensive HTML report from Allure test results.
None
Recent plan failures
| Failed In | Fixed In | Time Taken To Fix | ||
|---|---|---|---|---|
| #58 |
Manual run by Akeem Wells
|
#60 |
Manual run by Akeem Wells
|
2 builds 27 minutes |
| #52 |
Changes by Bob Garwood
|
#53 |
Manual run by Akeem Wells
|
1 build 1 week, 1 day, 1 hour, 3 minutes |
- Average time to fix a failure: 4 days, 45 minutes
- Average number of builds between fixes: 1.5 builds
- The longest time taken to fix a failure is 1 week, 1 day, 1 hour, 3 minutes, from failure starting in build #52.
- The greatest number of builds taken to fix a failure is 2, from failure starting in build #58.