Build: #199 was successful
Job: Test VLASS 1.1 Stakeholder Tests MPI Many Linux 2.28 cvpost EL8 was successful
Test results
- 4 tests in total
- 42 minutes taken in total.
The following 4 tests have passed:
| Status | Test | Duration |
|---|---|---|
|
test_tclean_vlass_pipeline
test_vlass_1p1_jointmosaic_pcorr1and2
|
15 mins | |
|
test_tclean_vlass_pipeline
test_vlass_1p1_row_pcorr0
|
9 mins | |
|
test_tclean_vlass_pipeline
test_vlass_1p1_row_pcorr1_oneint
|
8 mins | |
|
test_tclean_vlass_pipeline
test_vlass_1p1_row_pcorr1and2_twoint
|
9 mins |
- Showing 1-4 of 4