Build: #29 was successful
Job: Test VLASS 1.2 Stakeholder Tests cvpost EL8 was successful
Test results
- 1 test in total
- 871 minutes taken in total.
The following 1 test have passed:
Status | Test | Duration |
---|---|---|
test_stk_vlass_pipeline_imaging_1v2
test_stk_vlass_pipeline_imaging_1v2
|
871 mins |
- Showing 1-1 of 1