None

Recent branch failures

Failed In Fixed In Time Taken To Fix
#1 First build for this plan

#5 Manual run by Rui Xue

4 builds

4 days, 2 hours, 12 minutes

  • Average time to fix a failure: 4 days, 2 hours, 12 minutes
  • Average number of builds between fixes: 4 builds
  • The longest time taken to fix a failure is 4 days, 2 hours, 12 minutes, from failure starting in build #1.
  • The greatest number of builds taken to fix a failure is 4, from failure starting in build #1.