None
Recent failures
| Failed In | Fixed In | Time Taken To Fix | ||
|---|---|---|---|---|
| #13 |
Code changes detected
|
Currently failing | ||
| #9 |
Code changes detected
|
#10 |
Code changes detected
|
1 build 2 minutes |
- Average time to fix a failure: 2 days, 9 hours, 8 minutes
- Average number of builds between fixes: 1 builds
- The longest time taken to fix a failure is 4 days, 18 hours, 15 minutes, from failure starting in build #13.
- The greatest number of builds taken to fix a failure is 1, from failure starting in build #9.