Build: #1 was successful

Job: Test ALMA Stakeholder Multi Pointings Many Linux 2.28 cvpost EL8 was successful

Test results

  • 1 test in total
  • 157 minutes taken in total.

The following 1 test have passed:

All successful tests
Status Test Duration
Successful test_stk_alma_multi_ebs_multi_pointings_pipeline_imaging test_stk_alma_multi_ebs_multi_pointings_pipeline_imaging
157 mins
  • Showing 1-1 of 1