None

Recent branch failures

Failed In Fixed In Time Taken To Fix
#1 First build for this plan

Currently failing
  • Average time to fix a failure: 1 year, 12 weeks, 36 minutes
  • Average number of builds between fixes: 1 builds
  • The longest time taken to fix a failure is 1 year, 12 weeks, 36 minutes, from failure starting in build #1.
  • The greatest number of builds taken to fix a failure is 1, from failure starting in build #1.