None
Recent branch failures
Failed In | Fixed In | Time Taken To Fix | ||
---|---|---|---|---|
#1 |
First build for this plan
|
#2 |
Changes by David Mehringer
|
1 build 1 day, 1 hour, 17 minutes |
- Average time to fix a failure: 1 day, 1 hour, 17 minutes
- Average number of builds between fixes: 1 builds
- The longest time taken to fix a failure is 1 day, 1 hour, 17 minutes, from failure starting in build #1.
- The greatest number of builds taken to fix a failure is 1, from failure starting in build #1.