None

Recent branch failures

Failed In Fixed In Time Taken To Fix
#1 First build for this plan

Currently failing
  • Average time to fix a failure: 41 weeks, 6 days, 1 minute
  • Average number of builds between fixes: 0 builds
  • The longest time taken to fix a failure is 41 weeks, 6 days, 1 minute, from failure starting in build #1.
  • The greatest number of builds taken to fix a failure is 0, from failure starting in build #1.