Build: #1 was successful

Job: Pipeline PR Test 6.7.4 was successful

Stages & jobs

  1. Default Stage

validate date method: Test case result

The below summarizes the result of the test " validate date method" in build 1 of PIPESPECS - Pipeline Pull Request Test - PIPE-3013-main-hifa_cubeimage-recipe-should-have-editmode-replace-parameter-set-for-hif_editimlist - Pipeline PR Test 6.7.4.
Description
validate date method
Test class
pipeline.infrastructure.utils.casa_data_test
Method
test_validate_date_method
Duration
< 1 sec
Status
Successful