Build: #5 was successful
Job: Pipeline PR Test 6.7.4 was successful
explicit decorator[call with mpi]: Test case result
The below summarizes the result of the test " explicit decorator[call with mpi]" in build 5 of PIPESPECS - Pipeline Pull Request Test - PIPE-3269-add-parsl-adaptation-layer-in-pipeline - Pipeline PR Test 6.7.4.
- Description
- explicit decorator[call with mpi]
- Test class
- pipeline.infrastructure.mpirunner_test
- Method
- test_explicit_decorator[call_with_mpi]
- Duration
- < 1 sec
- Status
- Successful