Build: #1 was successful

Job: Pipeline PR Test 6.7.4 was successful

Stages & jobs

  1. Default Stage

applied calapps are disjoint and faithful: Test case result

The below summarizes the result of the test " applied calapps are disjoint and faithful" in build 1 of PIPESPECS - Pipeline Pull Request Test - PIPE-2610-multiple-overlapping-science-target-spw-combinations-in-bandpass-caltable-when-fillTable-False - Pipeline PR Test 6.7.4.
Description
applied calapps are disjoint and faithful
Test class
pipeline.h.tasks.applycal.applycal_test
Method
test_applied_calapps_are_disjoint_and_faithful
Duration
< 1 sec
Status
Successful