Build: #6 was successful
Job: Pipeline PR Test 6.7.4 was successful
inputs placeholder: Test case result
The below summarizes the result of the test " inputs placeholder" in build 6 of PIPESPECS - Pipeline Pull Request Test - PIPE-65-alma-pipeline-should-add-the-values-and-a-plot-of-the-ph-tgt-ck-separation-angles-to-the - Pipeline PR Test 6.7.4.
- Description
- inputs placeholder
- Test class
- pipeline.hifv.tasks.hanning.hanning_test.TestHanningInputs
- Method
- test_inputs_placeholder
- Duration
- < 1 sec
- Status
- Successful