Build: #1 was successful
Job: Pipeline PR Test 6.7.4 was successful
total time on target on source: Test case result
The below summarizes the result of the test " total time on target on source" in build 1 of PIPESPECS - Pipeline Pull Request Test - PIPE-2958-hsd_imaging-implement-qa-score-based-on-the-ratio-of-observed-image-rms-to-the-theoretical - Pipeline PR Test 6.7.4.
- Description
- total time on target on source
- Test class
- pipeline.infrastructure.utils.weblog_test
- Method
- test_total_time_on_target_on_source
- Duration
- < 1 sec
- Status
- Successful