Build: #1 was successful
Job: Pipeline PR Test 6.7.4 was successful
from mjd to datetime: Test case result
The below summarizes the result of the test " from mjd to datetime" in build 1 of PIPESPECS - Pipeline Pull Request Test - PIPE-3006-allow-hifa_wvrgcalflag-to-use-lowsnr-heuristic-for-gaincal-phaseup-and-bandpass - Pipeline PR Test 6.7.4.
- Description
- from mjd to datetime
- Test class
- pipeline.infrastructure.utils.casa_data_test
- Method
- test_from_mjd_to_datetime
- Duration
- < 1 sec
- Status
- Successful