Build: #1 was successful
Job: Pipeline PR Test 6.7.4 was successful
validate date method: Test case result
The below summarizes the result of the test " validate date method" in build 1 of PIPESPECS - Pipeline Pull Request Test - PIPE-3006-allow-hifa_wvrgcalflag-to-use-lowsnr-heuristic-for-gaincal-phaseup-and-bandpass - Pipeline PR Test 6.7.4.
- Description
- validate date method
- Test class
- pipeline.infrastructure.utils.casa_data_test
- Method
- test_validate_date_method
- Duration
- < 1 sec
- Status
- Successful