Build: #1 was successful

Job: Pipeline PR Test 6.7.4 was successful

Stages & jobs

  1. Default Stage

results lists copied: Test case result

The below summarizes the result of the test " results lists copied" in build 1 of PIPESPECS - Pipeline Pull Request Test - PIPE-2584-hifv_fluxboot-qa-criteria - Pipeline PR Test 6.7.4.
Description
results lists copied
Test class
pipeline.hifv.tasks.hanning.hanning_test.TestHanningResults
Method
test_results_lists_copied
Duration
< 1 sec
Status
Successful