Build: #96 was successful
Job: Pipeline PR Test 6.6.6 was successful
round half up[4.2-0-4.0]: Test case result
The below summarizes the result of the test " round half up[4.2-0-4.0]" in build 96 of Pipeline - Pipeline Pull Request Test - update-docs-build-and-packaging-setup - Pipeline PR Test 6.6.6.
- Description
- round half up[4.2-0-4.0]
- Test class
- pipeline.infrastructure.utils.math_test
- Method
- test_round_half_up[4.2-0-4.0]
- Duration
- < 1 sec
- Status
- Successful