Build: #95 was successful
Job: Pipeline PR Test 6.6.6 was successful
parallel map: Test case result
The below summarizes the result of the test " parallel map" in build 95 of Pipeline - Pipeline Pull Request Test - update-docs-build-and-packaging-setup - Pipeline PR Test 6.6.6.
- Description
- parallel map
- Test class
- pipeline.infrastructure.daskhelpers_test
- Method
- test_parallel_map
- Duration
- < 1 sec
- Status
- Skipped (Skipped)