Build: #92 was successful

Job: Pipeline PR Test 6.6.6 was successful

Stages & jobs

  1. Default Stage

validate date method: Test case result

The below summarizes the result of the test " validate date method" in build 92 of Pipeline - Pipeline Pull Request Test - update-docs-build-and-packaging-setup - Pipeline PR Test 6.6.6.
Description
validate date method
Test class
pipeline.infrastructure.utils.casa_data_test
Method
test_validate_date_method
Duration
< 1 sec
Status
Successful