Build: #5 was successful
Job: Pipeline PR Test 6.6.1 was successful
validate date method: Test case result
The below summarizes the result of the test " validate date method" in build 5 of Pipeline - Pipeline Pull Request Test - PIPE-2383-adjust-the-criteria-for-spectral-line-auto-detection - Pipeline PR Test 6.6.1.
- Description
- validate date method
- Test class
- pipeline.infrastructure.utils.casa_data_test
- Method
- test_validate_date_method
- Duration
- < 1 sec
- Status
- Successful