Build: #2 was successful

Job: Pipeline PR Test 6.6.1 was successful

Stages & jobs

  1. Default Stage

round up[4.2-0-5]: Test case result

The below summarizes the result of the test " round up[4.2-0-5]" in build 2 of Pipeline - Pipeline Pull Request Test - PIPE-2392-add-the-ruff-configuration-into-.ruff.toml - Pipeline PR Test 6.6.1. View test case history
Description
round up[4.2-0-5]
Test class
pipeline.infrastructure.utils.math_test
Method
test_round_up[4.2-0-5]
Duration
< 1 sec
Status
Successful