Build: #2 was successful
Job: Pipeline PR Test 6.6.1 was successful
date message type: Test case result
The below summarizes the result of the test " date message type" in build 2 of Pipeline - Pipeline Pull Request Test - PIPE-2392-add-the-ruff-configuration-into-.ruff.toml - Pipeline PR Test 6.6.1.
- Description
- date message type
- Test class
- pipeline.infrastructure.utils.casa_data_test
- Method
- test_date_message_type
- Duration
- < 1 sec
- Status
- Successful