Build: #2 was successful
Job: Pipeline PR Test 6.6.1 was successful
get dry opacity[in param4-49.17959626425098]: Test case result
The below summarizes the result of the test " get dry opacity[in param4-49.17959626425098]" in build 2 of Pipeline - Pipeline Pull Request Test - PIPE-2392-add-the-ruff-configuration-into-.ruff.toml - Pipeline PR Test 6.6.1.
- Description
- get dry opacity[in param4-49.17959626425098]
- Test class
- pipeline.h.tasks.common.atmutil_test
- Method
- test_get_dry_opacity[in_param4-49.17959626425098]
- Duration
- 16 secs
- Status
- Successful