Build: #1 was successful
Job: Pipeline PR Test 6.6.1 was successful
total time on target on source: Test case result
The below summarizes the result of the test " total time on target on source" in build 1 of Pipeline - Pipeline Pull Request Test - PIPE-2392-add-the-ruff-configuration-into-.ruff.toml - Pipeline PR Test 6.6.1.
- Description
- total time on target on source
- Test class
- pipeline.infrastructure.utils.weblog_test
- Method
- test_total_time_on_target_on_source
- Duration
- < 1 sec
- Status
- Successful