Build: #1 was successful
Job: Pipeline PR Test 6.6.1 was successful
to topo[230.4~230.7Ghz;231.5~231.6Ghz;232.3~232.4Ghz SOURCe-msnames1-fields1-18-observing run1-result1]: Test case result
The below summarizes the result of the test " to topo[230.4~230.7Ghz;231.5~231.6Ghz;232.3~232.4Ghz SOURCe-msnames1-fields1-18-observing run1-result1]" in build 1 of Pipeline - Pipeline Pull Request Test - PIPE-2313-hifv_flagtargets-data-should-apply-to-continuum-and-line-mses-if-present - Pipeline PR Test 6.6.1.
- Description
- to topo[230.4~230.7Ghz;231.5~231.6Ghz;232.3~232.4Ghz SOURCe-msnames1-fields1-18-observing run1-result1]
- Test class
- pipeline.infrastructure.contfilehandler_test
- Method
- test_to_topo[230.4~230.7GHz;231.5~231.6GHz;232.3~232.4GHz SOURCE-msnames1-fields1-18-observing_run1-result1]
- Duration
- < 1 sec
- Status
- Successful