Build: #9 was successful
Job: Pipeline PR Test 6.6.1 was successful
from mjd to datetime: Test case result
The below summarizes the result of the test " from mjd to datetime" in build 9 of Pipeline - Pipeline Pull Request Test - PIPE-1969-update-pipeline-task-cli-docstrings-to-a-standard-format - Pipeline PR Test 6.6.1.
- Description
- from mjd to datetime
- Test class
- pipeline.infrastructure.utils.casa_data_test
- Method
- test_from_mjd_to_datetime
- Duration
- < 1 sec
- Status
- Successful